Bangalore-Nagore passenger via Mayiladuthurai from July 1
<http://pinterest.com/pin/create/button/?url=http://www.thehindu.com/tod
ays-paper/tp-national/tp-tamilnadu/article3475155.ece&media=http://www.t
hehindu.com/multimedia/dynamic/01099/30may_tysms09_PAGE_1099465g.jpg&des
cription=Bangalore-Nagore%20passenger%20via%20Mayiladuthurai%20from%20Ju
ly%201>
1
<http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/article34
75155.ece>
Running of the daytime service follows completion of BG conversion works
The much-awaited direct train service from Nagore to Bangalore would be
re-introduced from July 1.
The Railways has proposed to extend the Bangalore-Salem daytime
passenger train to Nagore and it will be operated via the newly-laid
Tiruvarur-Mayiladuthurai BG section.
The Nagore-Bangalore passenger will be the first passenger train to be
operated on the Tiruvarur-Mayildathurai track, ever since the BG
conversion works were completed in this section in March last.
The Bangalore City-Salem passenger (56514) will be extended to Nagore
with effect from July 1 and the Salem-Bangalore City junction passenger
(56513) will run from Nagore on July 2, according to a press release of
the Southern Railway here on Wednesday.
At present, the Bangalore-Nagore passenger will leave Bangalore at 7.15
a.m. and arrives at Salem at 12.55 p.m. It will leave Salem at 1 p.m.
and will arrive at Nagore station at 10 p.m.
In the return direction, the Nagore-Bangalore passenger will leave
Nagore at 4 a.m. and will reach Salem junction at 1.25 p.m. It will
depart from Salem at 1.30 p.m. and will reach Bangalore city junction at
7 p.m.
Stoppages
The stoppages along the extension include Salem junction, Salem Market,
Salem Town, Ayodhyapattanam, Minnampalli, Valappadi Gate, Ettapur Road,
Peddanayakkan Palalyam, Attur, Talaivasal, Melnariyppanur, Chinna Salem,
Siruvattur, Pukiravari, Kuttakudi, Mukhasaparur, Vriddhachalam, Uttangal
Mangalam, Neyveli, Vadalur, Kurinjipadi, Cuddalore Port, Parangipettai,
Chidambaram, Vallampadugai, Kollidam, Sirkazhi, Vaitheeswarankoil,
Anandatandavapuram, Nidur, Mayiladuthurai, Peralam, Nannilam, Tiruvarur,
Nagapattinam and Nagore.
It may be recalled that the daytime Nagore passenger train via
Tiruvarur, Mayiladuthurai, Cuddalore, and Vriddhachalam which provided
direct connectivity to the devotees of Karnataka to visit the shrines of
Tirunallar, Velankanni and Nagore, was suspended a few years ago for the
BG conversion works between Bangalore and Salem. After this BG
conversion works were over, this passenger train was operated between
Salem and Bangalore.
Rs. 204 crore
The Railways, a few years ago, announced the extension of the
Bangalore-Salem passenger train to Nagore, after the completion of the
BG conversion works in the Tiruvarur-Mayiladuthurai section.
The 38-km Tiruvarur-Mayiladuthurai section was converted into BG track
at a cost of Rs. 204 crore. S.K. Mittal, Commissioner for Railway
Safety, conducted mandatory inspection of the new track on March 22 and
certified it fit for train movement.
Goods train services were introduced on the newly-laid
Tiruvarur-Mayiladuthurai section in the first week of April.
--
Anbudan,
Karthikeyan.J
Cell: 09902268108
அருட்பெருஞ்ஜோதி அருட்பெருஞ்ஜோதி
தனிப்பெருங்கருணை அருட்பெருஞ்ஜோதி
--
To register to this vallalargroups, and Old Discussions http://vallalargroupsmessages.blogspot.com/
To change the way you get mail from this group, visit:
http://groups.google.com/group/vallalargroups/subscribe?hl=en
அருட்பெருஞ்ஜோதி அருட்பெருஞ்ஜோதி
தனிப்பெருங்கருணை அருட்பெருஞ்ஜோதி
எல்லா உயிர்களும் இன்புற்று வாழ்க
Vadalur Jothi Ramalinga Swamigal(Thiru Arut Prakasa Vallalar , Ramalinga Adigalar) Concepts , Vallalar Education ,Vallalar Study Material , Vallalar MP3 Speeches , Vallalar DVD , Vallalar Books,Vallalar Functions - Information Sharing etc
Monday, June 4, 2012
Subscribe to:
Post Comments (Atom)
Popular Posts
-
"நல்லோர் மனத்தை நடுங்கச் செய்தேனோ! வலிய வழக்கிட்டு மானங் கெடுத்தேனோ! தானங் கொடுப்போரைத் தடுத்து நின்றேனோ! கலந்த சினேகரைக் கலகஞ் செய்தேன...
-
"அருளே நம் இனம்; அருளே நம் குலம் என்ற சிவமே" - vallalar வாத்து தன்னுடைய ஆறு குட்டிகளுடன் ஒரு பகுதியை கடக்கிறது ....
-
Thank you for send this animation phots keep send like this message Thank you 2008/12/19 Sabapathy Sivayoham < s.sivayoham@doctors.o...
-
This event has been changed. more details » Changed: Monthly First Sunday Online Satvicharam ur When Sun 2 Jun 2019 7:30pm – 9:30pm India S...
-
arutperunjothi,need moore details contact 9942776351,9443489849 -- Best Regards, ArulThiru.Babu Sadhu, Arutperunjothi Vallalar Charitable Tr...
-
🍒 திருக்குறள். 🍒 ●●●●●●●●●●●●●●●● 🍒 காமம் வெகுளி மயக்கம் இவைமூன்றன் நாமம் கெடக் கெடும் நோய். 🍒 🍒 காமம், வெகுளி, மயக்கம் என்னும் இவை...
-
more details » Fist Sunday Sathvicharam at Bangalore Sanmarga Sangam When Sun 2 Sep 2018 10:30am – 4:30pm India Standard Time - Kolkata Whe...
-
அருட்பெருஞ்ஜோதி அருட்பெருஞ்ஜோதி தனிப்பெருங்கருணை அருட்பெருஞ்ஜோதி Reply from Sakka-kalai Author Prof.K.Narayanan: There is nothing wr...
-
I HAVE LATEST SONG.PL CONTACT ME. On Tue, Mar 12, 2013 at 7:39 AM, sada.sivam < sada.sivampalani@gmail.com > wrote: arutperunjothi...
-
Sir, Can you name the author and the title of the book? so that everybody can be aware of this matter. anbudan v.p.chenthilraja ...
Contact Form
Translitrator(English to Tamil)
Type in Tamil(Press Ctrl+g to toggle between English and Tamil)
No comments:
+Grab this
Post a Comment