Monday, June 4, 2012

[vallalargroups:4559] Good News - Bangalore-Nagore passenger via VADALUR from July 1

Bangalore-Nagore passenger via Mayiladuthurai from July 1



<http://pinterest.com/pin/create/button/?url=http://www.thehindu.com/tod
ays-paper/tp-national/tp-tamilnadu/article3475155.ece&media=http://www.t

hehindu.com/multimedia/dynamic/01099/30may_tysms09_PAGE_1099465g.jpg&des
cription=Bangalore-Nagore%20passenger%20via%20Mayiladuthurai%20from%20Ju
ly%201
>

1
<http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/article34
75155.ece>

Running of the daytime service follows completion of BG conversion works



The much-awaited direct train service from Nagore to Bangalore would be
re-introduced from July 1.

The Railways has proposed to extend the Bangalore-Salem daytime
passenger train to Nagore and it will be operated via the newly-laid
Tiruvarur-Mayiladuthurai BG section.

The Nagore-Bangalore passenger will be the first passenger train to be
operated on the Tiruvarur-Mayildathurai track, ever since the BG
conversion works were completed in this section in March last.

The Bangalore City-Salem passenger (56514) will be extended to Nagore
with effect from July 1 and the Salem-Bangalore City junction passenger
(56513) will run from Nagore on July 2, according to a press release of
the Southern Railway here on Wednesday.

At present, the Bangalore-Nagore passenger will leave Bangalore at 7.15
a.m. and arrives at Salem at 12.55 p.m. It will leave Salem at 1 p.m.
and will arrive at Nagore station at 10 p.m.

In the return direction, the Nagore-Bangalore passenger will leave
Nagore at 4 a.m. and will reach Salem junction at 1.25 p.m. It will
depart from Salem at 1.30 p.m. and will reach Bangalore city junction at
7 p.m.

Stoppages

The stoppages along the extension include Salem junction, Salem Market,
Salem Town, Ayodhyapattanam, Minnampalli, Valappadi Gate, Ettapur Road,
Peddanayakkan Palalyam, Attur, Talaivasal, Melnariyppanur, Chinna Salem,
Siruvattur, Pukiravari, Kuttakudi, Mukhasaparur, Vriddhachalam, Uttangal
Mangalam, Neyveli, Vadalur, Kurinjipadi, Cuddalore Port, Parangipettai,
Chidambaram, Vallampadugai, Kollidam, Sirkazhi, Vaitheeswarankoil,
Anandatandavapuram, Nidur, Mayiladuthurai, Peralam, Nannilam, Tiruvarur,
Nagapattinam and Nagore.

It may be recalled that the daytime Nagore passenger train via
Tiruvarur, Mayiladuthurai, Cuddalore, and Vriddhachalam which provided
direct connectivity to the devotees of Karnataka to visit the shrines of
Tirunallar, Velankanni and Nagore, was suspended a few years ago for the
BG conversion works between Bangalore and Salem. After this BG
conversion works were over, this passenger train was operated between
Salem and Bangalore.

Rs. 204 crore

The Railways, a few years ago, announced the extension of the
Bangalore-Salem passenger train to Nagore, after the completion of the
BG conversion works in the Tiruvarur-Mayiladuthurai section.

The 38-km Tiruvarur-Mayiladuthurai section was converted into BG track
at a cost of Rs. 204 crore. S.K. Mittal, Commissioner for Railway
Safety, conducted mandatory inspection of the new track on March 22 and
certified it fit for train movement.

Goods train services were introduced on the newly-laid
Tiruvarur-Mayiladuthurai section in the first week of April.






--




Anbudan,
Karthikeyan.J
Cell: 09902268108

அருட்பெருஞ்ஜோதி அருட்பெருஞ்ஜோதி
தனிப்பெருங்கருணை அருட்பெருஞ்ஜோதி

--
To register to this vallalargroups, and Old Discussions http://vallalargroupsmessages.blogspot.com/

To change the way you get mail from this group, visit:
http://groups.google.com/group/vallalargroups/subscribe?hl=en

அருட்பெருஞ்ஜோதி அருட்பெருஞ்ஜோதி
தனிப்பெருங்கருணை அருட்பெருஞ்ஜோதி

எல்லா உயிர்களும் இன்புற்று வாழ்க

No comments:

Type in Tamil (Press Ctrl+g to toggle between English and Tamil)
+Grab this

Post a Comment

Popular Posts

Contact Form

Name

Email *

Message *

Translitrator(English to Tamil)

Type in Tamil(Press Ctrl+g to toggle between English and Tamil)

Translate

Translator

Subscribe-(Free)